Search Details

Word: airport (lookup in dictionary) (lookup stats)
Dates: during 2000-2009
Sort By: most recent first (reverse)


Usage:

...AIRPORTS 28,000 Number of bags put into temporary storage when an automated baggage-handling system malfunctioned during the launch of a modern new terminal at London's Heathrow airport $8.56 billion Cost of the new terminal at Heathrow. During a glitch-filled first four days of operation, nearly 250 flights in and out of the new facility were canceled...

Author: /time Magazine | Title: Verbatim | 4/3/2008 | See Source »

...Veasey has a studio in an old radar station lined with a foot of lead and equipped with an industrial scanner 60 times as powerful as medical ones. But to make a life-size X ray of a Boeing 777 for Boston's Logan Airport in 2003, even that wasn't enough - he needed artistic ingenuity too. Over several months, he digitally stitched together 500 separate X-rays of the plane. The resulting picture is exquisite and gets beneath the surface of every detail. Except for the pilot and crew: for them, Veasey used skeletons as stand...

Author: /time Magazine | Title: X-ray Photography: Inner Beauty | 4/2/2008 | See Source »

...Friday morning, British newspapers were lambasting the new terminal as a "disgrace," and BA then announced it would be canceling one out of every five flights during the terminal's second day. The airport held overnight meetings (while some passengers were sleeping on the premises) and its attitude toward journalists became decidedly frosty. An army of support staff holding clipboards and wearing blue t-shirts emblazoned with the question "Can I help?" marched around the terminal. Their answers to media queries mirrored official statements and were structured with supporting evidence. As one employee, who asked not to be identified, says...

Author: /time Magazine | Title: Chaos at Heathrow's New Terminal | 3/28/2008 | See Source »

Just over two weeks ago, Queen Elizabeth II officially opened Heathrow Airport's Terminal 5 - a light and airy structure that seems to be made solely of stone, steel and glass. She praised the $9 billion terminal as "a triumph of ambition, commitment and collaboration" and boasted that it would put Heathrow back where it belonged, "at the edge of global travel." Function aside, pamphlets touted the ergonomic design of check-in desks and the choice of sinks in the washroom facilities. Terminal 5 wasn't merely an airport extension, officials wanted the world to believe. It was a monument...

Author: /time Magazine | Title: Chaos at Heathrow's New Terminal | 3/28/2008 | See Source »

...hasn't exactly panned out like that. Thursday's opening was a disaster. British Airways, the sole carrier operating from the terminal, canceled 34 flights, owing to computer glitches, human error and, according to airport officials, "initial teething problems." There were also staff shortages: some employees struggled to get through security checkpoints, while others couldn't find the employee parking lot. Only one of the terminal's eighteen elevators was functioning, and at least one handicapped passenger was left stranded curbside - for an hour...

Author: /time Magazine | Title: Chaos at Heathrow's New Terminal | 3/28/2008 | See Source »

Previous | 98 | 99 | 100 | 101 | 102 | 103 | 104 | 105 | 106 | 107 | 108 | 109 | 110 | 111 | 112 | 113 | 114 | 115 | 116 | 117 | 118 | Next