Search Details

Word: aloftness (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

Challenger had blasted off even though the temperature at the cape was 38 degrees . During the night, a subfreezing cold had chilled the shuttle, and surface winds of 30 m.p.h.. had aggravated the problem. Chunks of ice floated in water tanks laced with antifreeze. Once aloft on its tragic 73-sec. flight, Challenger was assailed by 75-m.p.h. gales, producing, even before the explosion, what one NASA engineer called "an extremely rough ride, maybe the roughest yet." At sea, ships assigned to recover the $25 million boosters were heading for safe harbors as waves broke over their gunwales...

Author: /time Magazine | Title: Space: Fixing Nasa | 6/9/1986 | See Source »

Navy brass point out that the $75 billion array of carrier groups looked pretty intimidating to Gaddafi, who dared not send his 535-plane air force aloft to challenge the Sixth Fleet. But questions about both the cost and effectiveness of the operation are sure to be part of the continuing debate over how to allocate military resources and structure the Pentagon bureaucracy for the defense the U.S. will need in the decade to come...

Author: /time Magazine | Title: Questions and Reforms | 4/14/1986 | See Source »

Then came Mir. On March 13, the Soviets sent veteran Cosmonauts Kizim, 44, and Solovyev, 39, aloft on Soyuz T-15 to activate the space platform, which had been launched into a slightly elliptical 210-mile-high orbit three weeks earlier.* The subsequent rendezvous marked a milestone: the establishment of what the Soviets have heralded as the first permanently manned space station. According to current estimates, the first comparable U.S. station will not be operational before...

Author: /time Magazine | Title: Space: Moscow's Program Takes Off | 3/31/1986 | See Source »

Until January's accident, the space shuttle had been scheduled to carry aloft seven satellites this year and 19 in 1987. That total included two commercial satellites in 1986 and six next year, at a launching fee of up to $40 million each. Since NASA has scrapped that plan, several customers have started shopping around. Western Union was forced to postpone the June trip of its Westar VI, a 24-channel communications satellite designed to replace an older, twelve-channel model. GTE Spacenet had planned to send up its G-Star III, which would relay telephone and television signals...

Author: /time Magazine | Title: Scramble to the Launching Pad | 3/31/1986 | See Source »

...cold spots" of 7 degrees and 9 degrees F on the lower part of the right-hand booster; and 3) most unsettling of all, neither of the first two findings had been conveyed to at least three of the highest officials responsible for making the decision to send Challenger aloft...

Author: /time Magazine | Title: The Questions Get Tougher | 3/3/1986 | See Source »

Previous | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | Next