Word: amount
(lookup in dictionary)
(lookup stats)
Dates: during 1920-1929
Sort By: most recent first
(reverse)
...days. He is tall, heavy, and possessed of a great deal of racing experience but whether or not he will shape up to the requirements for a good stroke oar whether Gains to be seen. In the short stretches he sends his crew along with about the same amount of form as the first eight cut the crucial test which comes in raising the beat is still...
Although as was pointed out in yesterday's CRIMSON the recent decision of the corporation to add the second floor to the gymnasium will save a considerable amount of money and add to the minor sport facilities of the College, one of the most pressing problems still remains unsolved. The completion of the third story with its three basketball courts remains lying on the laps of the gods...
...benefit of East Boston. Why not blast the Elevated for the way it laid tracks in the Bennington boulevard, destroying the beauty of a highway that cost $750.000? Why not roar at Mayor Nichols for cancelling the taxes of the East Boston Land Co, to the amount of one hundred fifty-two thousand dollars? Why not condemn the outrageous bathing facilities for the little children at Wood Island, where the bathhouses is on the edge of a dirty pool, a breeder of typhoid? Why not speak up for a shore reservation from Wood Island through the Fourth Section to Orient...
...this point however, little of the vast amount of steel that is necessary to the completed building would have been used, only 20,000 tons of steel construction being necessary below the second story level. The second story is composed largely of steel, the trusses being the foundation of support for the upper reaches of the building as well as a central factor in tieing up the construction previous to this point...
...erect a temporary roof upon the conclusion of the first floor would therefore necessitate a large amount of steel, to bear the strain that will now be undertaken by the permanent trusses. The cost of a temporary roof over the first floor was estimated by the architects at $46,000, a figure which was unusually large because of the expensive material that must be included in even such a temporary structure...