Search Details

Word: bathes (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

Hollis Hall, North Entry--"Twelve Knights in a Bath Room," 17-24. "The Castaways," Rooms 25-32. South Entry --"Slippery Eels," Rooms 1-8. "The Extra-Drys," Rooms...

Author: NO WRITER ATTRIBUTED | Title: 1914 DORMITORY ALLOTMENT | 1/29/1913 | See Source »

...building committee has had tentative plans drawn up by Messrs. McKim, Mead, and White with provision especially for additional sleeping facilities. The fourth and fifth floors will each contain eighteen bed-rooms with suitable bath-rooms. The additional space on the sixth floor will be used for squash courts, showers, and dressing rooms, provision for which, with the addition of a swimming pool, has also been made in the basement...

Author: NO WRITER ATTRIBUTED | Title: NEW YORK HARVARD CLUB | 11/7/1912 | See Source »

...coaching launch which was recently purchased by the Harvard Rowing Committee through graduate subscription8 has so far proved to be very satisfactory. The boat, which was built by the Bath Marine Construction Company through the agency of A. P. Homer, of Boston, is especially designed for crew coaching, and fills a need which the coach has felt for several years. It is a V-bottomed boat, 30 feet by 5 feet, 6 inches, equipped with a four-cylinder 18-25 H. P. Sterling Engine of the latest type, including among other accessories a Bosch magneto and a rear starter...

Author: NO WRITER ATTRIBUTED | Title: NEW LAUNCH FOR COACHES | 5/18/1912 | See Source »

...guaranteed speed is 16 miles an hour but his was exceeded in the official trial in the Basin last week, when the boat covered a measured mile at the rate of 18.6 miles per hour with four people aboard, and at the builder's trial at Bath, Maine, when the boat reached 20.6 miles per hour with two people aboard. Running at this speed the launch can be handled easily. The launch draws very little water, and the design is unique in that the boat does not leave a wake, sufficient to disturb an eight-oared crew, even when...

Author: NO WRITER ATTRIBUTED | Title: NEW LAUNCH FOR COACHES | 5/18/1912 | See Source »

...Harvard Rowing Committee, under the chairmanship of Mr. R. F. Herrick '90, contracted with A. P. Homer, of Boston, for the purchase of a new launch of unique design especially planned for crew coaching. It will be constructed by the Bath Marine Construction Company, in whose offices the plans were drawn. The launch is to be a V-bottomed boat 30 feet by 5 feet 6 inches, equipped with a four-cylinder 18-25 H.P. Sterling engine of the most improved type, including among other accessories a Bosch magneto and a rear starter, the guaranteed speed being 16 miles...

Author: NO WRITER ATTRIBUTED | Title: NEW LAUNCH FOR CREWS | 3/23/1912 | See Source »

Previous | 579 | 580 | 581 | 582 | 583 | 584 | 585 | 586 | 587 | 588 | 589 | 590 | 591 | 592 | 593 | 594 | 595 | 596 | 597 | 598 | 599 | Next