Search Details

Word: builded (lookup in dictionary) (lookup stats)
Dates: during 1880-1889
Sort By: most recent first (reverse)


Usage:

...Annex which it is proposed to build to Trinity's new gymnasium, it is expected there will be enough room for an entire "in field" for base-ball practice...

Author: NO WRITER ATTRIBUTED | Title: Fact and Rumor. | 5/10/1886 | See Source »

...instruction and supervision is doing much for the athletic men. Next year regular gymnasium work will be prescribed by the college, and much curiosity is felt to know the outcome of this innovation. The present gymnasium, though good, is merely temporary, as a plan is on foot to build a new and expensive one, which will rival the Hemenway; the ground has been chosen, and work will be begun as soon as the necessary funds are raised...

Author: NO WRITER ATTRIBUTED | Title: Athletics at the University of Pennsylvania. | 4/20/1886 | See Source »

...Rather hard for 7 to swing well with stroke as his build is so different. Is apt to slump and row out at the finish...

Author: NO WRITER ATTRIBUTED | Title: The University Crew. | 4/15/1886 | See Source »

...great event of the afternoon was the middle-weight sparring between G. R. Ashe, '87, and I. R. Thomas, '88. Thomas is twenty pounds heavier and a little shorter than Ashe, who is of very slight build. The first round was opened by Ashe with a smart blow on Thomas' face; in return getting a couple of body blows. Both men were evidently saving themselves for the last two rounds. Time was called with the round in Ashe's favor. Thomas began work in the second, evidently trying to make his superior weight and strength tell by beating down...

Author: NO WRITER ATTRIBUTED | Title: First Winter Meeting. | 3/8/1886 | See Source »

Many students on their way to Fresh Pond to enjoy the bracing effect of a quiet afternoon's skate have doubtless noticed along Lake View Avenue a large, square, brick building, with massive granite columns in front. This structure, known as the Cambridge Water Works, was commenced in 1872, completed a year later, and together with the machinery, boilers, and a long narrow extension in the rear, cost the city about $2,000,000. A subterannean conduit runs from the build to Fresh Pond, through which the water flows and fills three deep stone wells in the cellar...

Author: NO WRITER ATTRIBUTED | Title: The Cambridge Water Supply. | 2/10/1886 | See Source »

Previous | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | Next