Word: built
(lookup in dictionary)
(lookup stats)
Dates: during 1920-1929
Sort By: most recent first
(reverse)
...dormitory was designed by Coolidge, Shepley, Bulfinch, and Abbott, architects, and is being built by the Whiden-Beekman Company. It is expected that it will be completed by the middle of August, 1926, and be ready for occupancy next fall...
...found, however, that the cage could not be built there. At the desired spot the gravel covering the ground is 25 feet deep, making it impractical to build a large structure on it. There was also considerable opposition to putting the cage so far from the Locker Building...
...site where the cage will probably be built is outside the open end of the Stadium, covering a number of the tennis courts at the eastern end. The donor and engineer were ready to start work this autumn, but lack of definite word from the Planning Board will keep the cage from being started until next spring. It was also considered that work this fall would be in the way of the crowds attending the important football games...
...baseball cage is to be 160 feet square, considerably larger than the present cage. The latter was built about 30 years ago by the University...
Major Moore, who has long been advocating the erection of an adequate swimming pool, is confident that action will soon be taken and that a new tank will be built in the near future...