Search Details

Word: connect (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

With the network connection itself free of charge, users are ready to connect to the network with a computer device, called the Ethernet card, through the data phone jacks already present in their rooms...

Author: By Haibin Jiu, | Title: Campus Readies For Network | 9/28/1993 | See Source »

...gluey sugars were known to bind to a family of proteins called selectins, which had already been identified as the substances that connect white blood cells to blood vessel walls...

Author: By Geoffrey C. Hsu, | Title: RESEARCH BRIEFS | 9/28/1993 | See Source »

Like Epps, Rudenstine wants the ethos of Harvard life to be about finding common ground; he says that "the fruits of diversity can be harvested, if those of us in our universities--and in our larger society--can make the essential imaginative leaps that alone will enable us to `connect.'" Professor Henry Louis Gates, Jr. writes that "[p]luralism isn't supposed to be about policing the boundaries; it is supposed to be about breaking them down, acknowledging the fluid and interactive nature of all identities." That way, writes Gates, we will all come to realize that...

Author: By Daniel Choi, | Title: Noble Lies and the Search for Veritas | 9/17/1993 | See Source »

Thayer is still undergoing massive construction that will, among other things, connect the three previously separated sections with a corridor running through the building. It is scheduled to be completed at the beginning of 1994, just in time for the residents of Holworthy and Penny-packer to move in while the interiors of those dorms are renovated. The first years who would have lived in Thayer this year have been settled in at 29 Garden St., where the students displaced by the Weld renovation lived last year...

Author: By Marion B. Gammill, | Title: Six First-Year Dorms Renovated; Thayer Under Construction This Fall | 9/17/1993 | See Source »

Thayer is still undergoing massive construction that will, among other things, connect the three previously separated sections with a corridor running through the building. It is scheduled to be completed at the beginning of 1994, just in time for the residents of Holworthy and Pennypacker to move in while the interiors of those dorms are renovated. The first years who would have lived in Thayer this year have been settled in at 29 Garden St., where the students displaced by the Weld renovation lived last year...

Author: By Marion B. Gammill, | Title: Six First-Year Dorms Renovated; Thayer Under Construction This Fall. | 9/13/1993 | See Source »

Previous | 353 | 354 | 355 | 356 | 357 | 358 | 359 | 360 | 361 | 362 | 363 | 364 | 365 | 366 | 367 | 368 | 369 | 370 | 371 | 372 | 373 | Next