Search Details

Word: corwith (lookup in dictionary) (lookup stats)
Dates: during 1970-1979
Sort By: most recent first (reverse)


Usage:

...diesel units, totaling more 10,000 h.p., growl into action. They are pulling nine cars, mostly mail loaded in truck trailers carried on 85-ft. flatcars. From the cab track seems too frail and narrow to support 1,500 tons of locomotive and load. After the train leaves the Corwith yards, the speedometer needle creeps up slowly through the flat, industrial along the Des Plaines River. Finally are thundering along at 79 m.p.h., the top speed allowed this train. There a loud beeping sound over Gerty's an Alertor, with sensors wired to cab controls, has detected that...

Author: /time Magazine | Title: Fast Freight: Across the U.S. on Super C | 7/19/1971 | See Source »

| 1 | 2 | 3 | 4 | Next