Search Details

Word: designs (lookup in dictionary) (lookup stats)
Dates: during 1900-1909
Sort By: most recent first (reverse)


Usage:

There have been too few designs handed in for the Senior dance program. The design for the program will be decided upon Saturday. Designs should be handed in by 8 o'clock Saturday evening at Hollis 32. SENIOR SPREAD COMMITTEE...

Author: NO WRITER ATTRIBUTED | Title: Designs for Senior Dance Program | 3/28/1905 | See Source »

...Union has received from Mr. H. P. Arnold '52 a sum of money to supply a speaker's desk for use in the Living Room. At present the Library Committee has the design under consideration. It is hoped that the desk will be ready for use before Commencement...

Author: NO WRITER ATTRIBUTED | Title: Speaker's Desk for the Union. | 3/22/1905 | See Source »

...Cambridge. The order for the shell will be placed this week, but its final construction will probably be delayed until May, in order that the weight of the crew may be known as nearly as possible. It will be ready for use in the last part of May. In design it will not differ essentially from last year's boat...

Author: NO WRITER ATTRIBUTED | Title: New Crew Shells in Construction. | 3/13/1905 | See Source »

...five new wherries which were ordered from Davy for the Weld Boat Club are finished, with the exception of rigging. Great care has been taken in their design, and the best possible material has been used throughout their construction in order that they may be thoroughly first-class boats. Their dimensions are as follows: length, 19 feet, 6 inches; beam, 24 inches; depth, 10 inches. They are the first boats of the kind which have been built for the Weld Boat Club, and since so much care has been taken in their construction it is expected that they will prove...

Author: NO WRITER ATTRIBUTED | Title: New Crew Shells in Construction. | 3/13/1905 | See Source »

...Yale eight-oared shells, which are also being constructed at Davy's shop, are completed, with the exception of rigging. In design and construction they are practically identical with last year's Yale shell. They will be delivered within the next two weeks...

Author: NO WRITER ATTRIBUTED | Title: New Crew Shells in Construction. | 3/13/1905 | See Source »

Previous | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | Next