Search Details

Word: drilled (lookup in dictionary) (lookup stats)
Dates: during 1910-1919
Sort By: most recent first (reverse)


Usage:

...managership at the Athletic Association at 1.30 o'clock. Candidates for the team will report at the same place at 4 o'clock, where they will listen to a talk by Major Paul Withington '09, who will coach the Freshmen this year. The first workout will consist of drill in the elements of the game; practicing starts, falling on the ball, passing, etc. After Monday regular daily practice will continue throughout the season, which will last until the Yale game on November...

Author: NO WRITER ATTRIBUTED | Title: FRESHMAN FOOTBALL MEN REPORT AT H.A.A. MONDAY | 9/20/1919 | See Source »

...scrimmaging is expected until next week, and the drill so far has been entirely in fundamentals. Dr. Sharpe has already made it clear that the team will be thoroughly grounded in the rudiments of the game through the twice daily daily practice in scientific starting, turning, passing, punt-catching, and general handling of the ball...

Author: NO WRITER ATTRIBUTED | Title: ELIS HAVE MANY VETERANS | 9/19/1919 | See Source »

Alumni meeting in the Drill Shed...

Author: NO WRITER ATTRIBUTED | Title: PLAN CLASS DAY PROGRAM | 6/7/1919 | See Source »

...complete program of events for Class Day and commencement week, as well as the meeting places of the alumni associations of the University have been announce. One change in the usual program is that the meeting of the Alumni Association will be held in the Drill Shed off Oxford St., which is farther away from the yard than the usual, place of assembly. For this reason, the precession will form in front of Massachusetts Hall at 1 o'clock, a half-hour earlier than formerly...

Author: NO WRITER ATTRIBUTED | Title: PLAN CLASS DAY PROGRAM | 6/7/1919 | See Source »

...drill hall will at once be turned over to the newly established Harvard Engineering School for use as a laboratory for mechanical engineering. It is a large building, 280 feet long and 100 feet wide, with a power house immediately adjacent to it, and when fitted out will offer unusually ample facilities for laboratory work in mechanical engineering. It will also enable the electrical laboratories located in Pierce Hall to more than double their present capacity, and will increase as well the laboratory facilities in sanitary engineering and metallurgy...

Author: NO WRITER ATTRIBUTED | Title: UNIVERSITY COMPLETES DEAL FOR NAVAL RADIO DRILL HALL | 6/6/1919 | See Source »

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | Next