Word: fall
(lookup in dictionary)
(lookup stats)
Dates: during 1910-1919
Sort By: most recent first
(reverse)
...fall competition for all departments of the Illustrated will begin the second week after the opening of the University in September. The competitions will be open only to members of the class of 1918. Candidates will be called out for the literary, photographic and business departments...
...equipment; and this will be done during the summer. It is expected that all of the University books will be transferred from the buildings where they are now housed by the end of the summer so that the Library will be ready for use when College opens next fall...
...extension of 100 feet in length to the Museum was completed last fall. This is the second addition which has been made since the south wing of the Museum was begun in 1876, when an extension of 40 feet facing on Divinity avenue was built. An addition of 60 feet was made in 1888, and last year the wing was completed by building 100 feet more and connecting the new section with the main building as planned by Louis Agassiz in 1859. The completion of this wing doubles the space for exhibitions in the Peabody Museum, which is the anthropological...
...quarters for the CRIMSON on Plympton street will be ready for occupancy with the opening of College in the fall. Even if the interior work on the front portion of the building is not completed, the presses in the rear will be set up and ready for use. The equipment of the Crimson Printing Company will be transferred from the Union during the summer and the company will continue its present relations with the CRIMSON, renting its space in the new building from the CRIMSON, and printing the newspaper under contract...
...Waterman '15, of Fall River, Substitute catcher, played on his Freshman team and was regular catcher for the University last year. He prepared at the Rurfee High School, Fall River, Weighs 136 pounds, is 5 feet, 7 inches tall, and is 22 years...