Word: flashboard
(lookup in dictionary)
(lookup stats)
Dates: all
Sort By: most recent first
(reverse)
While awaiting the river's assault, the more populous Omaha-Council Bluffs area worked feverishly to strengthen flood walls, assisted by thousands of Army troops, National Guardsmen and Army Engineers. A two-foot "flashboard" was being added to the 31½-ft. levee and flood wall at Omaha. But its value was as much psychological as physical. Few expected the levee to withstand the pressure of a predicted 31½-ft. flood crest. After inspecting the inadequate dikes and flood walls, Brigadier General Don G. Shingler, Missouri River Division Engineer, remarked gloomily: "The Missouri is coming with...
| 1 |