Search Details

Word: floors (lookup in dictionary) (lookup stats)
Dates: during 1910-1919
Sort By: most recent first (reverse)


Usage:

...recess will extend from Sunday, December 21, to Sunday, January 4, inclusive. Every undergraduate is required to register after his last College exercise preceding the recess, and also on Monday, January 5, between 9 and 1.30 o'clock. The registration room will be 18 University Hall, north entry, second floor...

Author: NO WRITER ATTRIBUTED | Title: Must Register Before Leaving | 12/19/1913 | See Source »

...recess will extend from Sunday, December 21, to Sunday, January 4, inclusive. Every undergraduate is required to register after his last College exercise preceding the recess and also on Monday, January 5, between 9 and 1.30 o'clock. The registration room will be 18 University Hall, north entry, second floor...

Author: NO WRITER ATTRIBUTED | Title: Register Before Leaving | 12/18/1913 | See Source »

...recess will extend from Sunday, December 21, to Sunday, January 4, inclusive. Every undergraduate is required to register after his last College exercise proceeding the recess and also on Monday, January 5, between 9 and 1.30 o'clock. The registration room will be 18 University Hall, north entry, second floor...

Author: NO WRITER ATTRIBUTED | Title: Registration Before Recess | 12/17/1913 | See Source »

...reason for remodelling the second floor is the fact that air and light were sorely needed, the atmosphere under the low roof being particularly close in summer. Adequate light for the paintings was also lacking and in addition to these needs, the walls leaked. To remedy the evils, the roof has been raised a considerable distance, increasing the exhibition space, and greatly improving the ventilation of the second floor. The capacity of the photograph room has been enlarged and new cases with a more economical arrangement have been installed. Space which hitherto has gone to waste will be utilized...

Author: NO WRITER ATTRIBUTED | Title: REMODELLING OF FOGG MUSEUM | 12/8/1913 | See Source »

...second floor consists of three divisions, the print room, the photograph room, and the gallery of paintings. The raising of the roof will greatly enhance the facility of carrying on all departments, but the greatest gain is that of light for the main gallery and the stair corridor. A new sloping, slate roof has been built over the north exhibition room and the sky-lights have been considerably raised. The photograph rooms will have the advantage of added space on the side wings, and exhibition cases will be installed in the new quarters as soon as possible...

Author: NO WRITER ATTRIBUTED | Title: REMODELLING OF FOGG MUSEUM | 12/8/1913 | See Source »

Previous | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | Next