Search Details

Word: framing (lookup in dictionary) (lookup stats)
Dates: during 1900-1909
Sort By: most recent first (reverse)


Usage:

Among projected improvements are a swimming tank in the Locker Building and the erection of permanent iron-frame grandstands for football and baseball. The swimming tank is planned for the open court of the Locker Building. The wall of the part connecting the two wings of the building will be knocked out, a tank 44x25 feet built, and the whole space roofed with glass...

Author: NO WRITER ATTRIBUTED | Title: Soldiers Field Improvements. | 5/19/1900 | See Source »

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | Next