Search Details

Word: indoor (lookup in dictionary) (lookup stats)
Dates: during 1910-1919
Sort By: most recent first (reverse)


Usage:

...indoor rink is assured the hockey teams for this winter's season. It will be erected, facing Massachusetts avenue, in the second floor of the "Tech, Block building. The corporation has been formed, the lease signed and construction on the rink will begin very soon, so that it may be ready for use by the first of December...

Author: NO WRITER ATTRIBUTED | Title: CONSTRUCT NEW INDOOR RINK | 10/17/1919 | See Source »

...instructor. Beginning November 1, Mr. Conley will be at the Hemenway Gymnasium on Monday, Wednesday and Friday of each week from 1.45 to 4.45 o'clock. At that time he will give instruction in boxing to those men in the Freshman Physical. Training sections who elect boxing as their indoor exercise during the winter. These classes will also be open to upper classmen who are interested. Mr. Conley expects to remain at the gymnasium for one to two hours after these physical training periods. During that time he will give private advanced lessons to anyone who wishes to engage...

Author: NO WRITER ATTRIBUTED | Title: CONLEY NEW BOXING TEACHER | 10/16/1919 | See Source »

Those who wish lockers may get them at the Gymnasium by presenting their registration cards and the charge will be put on the term bill. The class will be instructed by Mr. Schrader, and many different types of activities such as basketball, indoor baseball, handball, and regular gymnasium class work, will be included in the work of the two sections...

Author: NO WRITER ATTRIBUTED | Title: Voluntary Physical Training Classes Will Start Monday | 9/30/1919 | See Source »

...addition to the present accommodations listed above a temporary Freshman Athletic Building is being constructed on Holyoke street, opposite Standish Hall, to be ready for occupancy about the middle of November. It will contain a large room, 46 by 80 feet, for handball, basketball, and other indoor sports. There will be two smaller rooms, each 20 by 30 feet, which will be equipped for fencing, boxing, and wrestling. Under these rooms, artillery equipment is to be stored. Shower baths, lockers, and an office complete the interior of the building...

Author: NO WRITER ATTRIBUTED | Title: PROGRAM OF COMPULSORY ATHLETICS FOR 1919-1920 ANNOUNCED | 9/22/1919 | See Source »

...outside, at each end of the structure, will be built an outdoor and ball court with concrete floor. These courts will be used in preference to the indoor courts except in inclement weather. Mr. William H. Geer, Director of the Department of Physical Training, announced that the new building will be ready for occupancy about the middle of November and that it will cost approximately...

Author: NO WRITER ATTRIBUTED | Title: NEW ATHLETIC BUILDING WILL OPEN IN NOVEMBER | 9/20/1919 | See Source »

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | Next