Search Details

Word: layouter (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

Editors often resort to "filler" to fill the page--literally. Even with the new layout, a longer paper and more advertisements in the fall season means that "filler" is often necessary to preserve the continuity of the page. Classic "filler" usually takes the form of messages from The Crimson. Boxes that say "Your Ad Here," or "Got a hot news tip?" are blatant filler. Reuters news photos are a welcome alternative to this, but should still be used as little as possible. However, rather than analyze the intent of Crimson editors in page layout, I'd like to extend...

Author: NO WRITER ATTRIBUTED | Title: Filling The Crimson | 10/24/1997 | See Source »

...have noticed a change for the better in The Crimson's coverage. The Crimson has become more professional and more relevant to student life. The new design has made The Crimson look more like a national newspaper, and the reporting has even exceeded the standards set by the new layout. Crimson President Joshua J. Schanker '98 cites the paper's effort to reach out to student leaders and organizations as well as the efforts of staff and compers as the ingredients of this change. I urge all involved with The Crimson to keep up the good work...

Author: NO WRITER ATTRIBUTED | Title: New Crimson, New Concerns | 10/10/1997 | See Source »

Renovations upstairs in the Palmer and Brattle buildings, which are scheduled to begin in October, will involve a wall treatment, flooring and a new layout. Upon completion, the second floor will house dorm items, school supplies and small electronics. The third floor will continue to stock textbooks...

Author: By Geoffrey C. Upton, CRIMSON STAFF WRITER | Title: Coop Revamps Layout, Drops Credit Card in Major Makeover | 9/12/1997 | See Source »

Renovations upstairs in the Palmer and Brattle buildings, which are scheduled to begin in October, will involve a wall treatment, flooring and a new layout. Upon completion, the second floor will house dorm items, school supplies and small electronics. The third floor will continue to stock textbooks...

Author: By Geoffrey C. Upton, CRIMSON STAFF WRITER | Title: Coop Revamps Layout, Drops Credit Card in Major Makeover | 9/10/1997 | See Source »

Renovations upstairs in the Palmer and Brattle buildings, which are scheduled to begin in October, will involve a wall treatment, flooring and a new layout. Upon completion, the second floor will house dorm items, school supplies and small electronics. The third floor will continue to stock textbooks...

Author: By Geoffrey C. Upton, CRIMSON STAFF WRITER | Title: Coop Revamps Layout, Drops Credit Card in Major Makeover | 9/8/1997 | See Source »

Previous | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | Next