Word: outdoors
(lookup in dictionary)
(lookup stats)
Dates: during 1910-1919
Sort By: most recent first
(reverse)
...will keep from 40 to 50 men busy at the same time. A few minor changes have been made, and the swimming pool and locker rooms are to be given a thorough cleaning before the building is open. It is planned to use this building during the months while outdoor exercise is still possible, in order to give exercise on rainy days to the Freshmen who are enrolled in physical training classes...
...cross-country squad will open its season this afternoon when all prospective runners will report to Coach Farrell in the Locker Building at 3 o'clock. The men will be divided into groups today and outdoor work will commence at once. Next Monday the Freshman squad will start practice on the Belmont track with the University team. The most promising men will be put at the regular training tables Monday...
...order to provide accommodations for the greatly increased number of men who will be exercising, the department of physical training will commandeer every available inch of Soldiers Field suitable for outdoor sport. As much as possible the men will be kept outdoors, for the director believes in the value of open air as a complement of exercise. In the winter time the men will have the use of Hemenway Gymnasium, Randolph Gymnasium, the Baseball Cage, the Dunster swimming pool and its squash courts. Thirteen squash and racquet courts will be available in Randolph Gymnasium after repairs now under...
There are to be two outdoor handball courts with concrete floor, one at each end of the building. These courts will be used in preference to those indoors, except during inclement weather. The building will cost approximately...
...outside, at each end of the structure, will be built an outdoor and ball court with concrete floor. These courts will be used in preference to the indoor courts except in inclement weather. Mr. William H. Geer, Director of the Department of Physical Training, announced that the new building will be ready for occupancy about the middle of November and that it will cost approximately...