Word: railroads
(lookup in dictionary)
(lookup stats)
Dates: during 1910-1919
Sort By: most recent first
(reverse)
Professor W. J. Cunningham, assistant professor of Transportation, was appointed by the Board of Overseers, his appointment to take effect from September 1, 1910. Mr. Cunningham has been a lecturer on railroad operation for the past two years...
...close. Although arrangements had been made to hold it on Soldiers Field, when all the entries had been received it was found that that place was altogether inadequate. Therefore the society procured a field at Squantum on a five years' lease from the New York, New Haven, and Hartford Railroad. This proved to be one of the best fields in the country for the purpose...
...annual Harvard-Yale boat races will be rowed on the Thames River at New London on Thursday, June 30. The race between the University eights will be rowed down-stream over the four-mile course, starting opposite Red Top, at 6 o'clock, and finishing at the railroad bridge at New London. The race between the Freshman eights will be rowed at 10 o'clock from the railroad bridge to the Navy Yard, a course of two miles. Immediately following this race the University fours will row over the upper two miles of the course, from the Navy Yard...
Harvard Crew Quarters, New London, Conn., June 20, 1910. -- A continuation of Saturday's light practice was the order of events this morning. During the afternoon all the crews were put through some hard work. The members of the University eight were taken downstream to the railroad bridge at New London in the "John Harvard" with the shell in tow. About six o'clock they started back over the four-mile course. Hooper rowed 5, having been put in for today's practice in Bacon's place. It is expected that Bacon will have quite recovered from his indisposition...
...Engineering 4a, Plane and Topographical Surveying, a full course beginning on June 23 and continuing for six weeks; Engineering 4c, Geodetic Surveying, a half-course beginning on June 14 and continuing three weeks, open to students who have passed satisfactorily in Engineering 4a in a previous summer; Engineering 4d, Railroad Engineering, a full course beginning August 4 and continuing five weeks, open to men who have passed course 4a or its equivalent; Engineering 5b, Elementary Statics, a half-course beginning June 23 and continuing three weeks, open to men who have passed Engineering 1b or its equivalent; Engineering 5e, elementary...