...flow of the Charles River was stopped yesterday by the closing of the dam that has been under construction for several months near the Craigie Bridge. The cutting off of the river channel is to allow the construction of the main section of the permanent dam and roadway. It will be fully a year from now before the completion of the entire work can be observed, for after the dam is finished a roadway 100 feet wide is to be built along its top, serving as a permanent substitute for the old Craigie Bridge. The shutting off of the water...
...lower side of the dam there will be a roadway 85 feet wide, and on the upper side a park or embankment of 6 3-4 acres. There will also be an esplanade constructed by the City of Boston, extending from Charles Bank park to Charlesgate East, making a drive and walks in the rear of Brimmer and Beacon streets. On the Cambridge side an embankment park, for which the land has already been purchased, will come nearly to the dam. The contract calls for the completion of the work by July...
There will be two coffer-dams and a navigation lock 350 feet long, with a drawbridge and sluices. On top of the dam a roadway will be constructed to replace the Craigie bridge, and a parkway of seven acres will be laid out. The dam will turn the estuary of the Charles river into a fresh water basin, maintaining a level two feet lower than mean high water...
...depth of from 15 to 50 feet. At the ends the height of the dam will be 21 feet above mean low water, about the present level of the street at the Cambridge end of Craigie bridge. On the lower side of the dam there will be a roadway 85 feet wide, and on the upper side a park or embankment of 6 3-4 acres. There will also be an esplanade constructed by the City of Boston, extending from Charles Bank park to Charlesgate East, making a drive and walks in the rear of Brimmer and Beacon streets...
...present East Cambridge or Craigie bridge, which will be removed. The dam will be sufficiently high to exclude all salt water and to maintain in the basin above, a water level approximately 8 feet higher than mean low water. On top of the dam there will be a roadway to replace the Craigie bride, and a parkway of about 7 acres...