...Fortune Theatre" as it existed in London in Elizabethan times. To make this possible, all the ground-floor seats in Sanders Theatre will be removed, and the stage built out into the pit about 20 feet. By means of scenic devices and drops, the galleries and tiled roof of the Elizabethan theatre will be made to appear in circular form. The curtain used will be a "trayers," suspended between pillars at either side of the stage, and the rear of the stage will be formed by an "arras," through which the actors will make their entrances. The stage furnishings will...

Author: NO WRITER ATTRIBUTED | Title: SHAKSPERIAN PERFORMANCE | 12/20/1907 | See Source »

Work on the Weld Boat House is rapidly nearing completion. The plastering and the interior work are already finished, and the tile roof will be completed today. Practically all that remains to be done to the building itself is the grading, which will be started today and should be finished by the end of the week. The floats and runs, however, are still to be put in place, and it is probable that this work will not be completed till July...

Author: NO WRITER ATTRIBUTED | Title: Weld Boat House Nearly Completed | 5/21/1907 | See Source »

...Holmes Field, has progressed much more rapidly recently than during the early winter, when unfavorable weather conditions materially retarded the work. The main part of the construction of the building is nom complete, all of the iron and steel girders being up and the stone work in place. The roof has been finished and half coppered: and the underground corridor between Austin Hall and the new building is complete, except for the laying of its floor. Work has just been begun on the electrical and steam heating apparatus and the ventilation fixtures. The progress on the work on the whole...

Author: NO WRITER ATTRIBUTED | Title: Main Work on Langdell Hall Finished | 3/18/1907 | See Source »

Owing to the present favorable weather conditions the work on the new Weld boathouse is progressing rapidly, and at present 75 men are working to complete the roof before the next cold weather. Practically all the steel work is finished. On the water or south side, both the upper and lower balconies are completed and nothing remains to be done except to give the brick a final dressing after the exterior work of the entire building is finished. All the cement is laid for the terrace on the north side...

Author: NO WRITER ATTRIBUTED | Title: Weld Boathouse Progressing Rapidly | 1/4/1907 | See Source »

...School Building on Holmes Field, which was begun last spring. However, comparatively little masonry work remains to be done. The walls are up and ready for the cornices. On top of the Ionic columns along the eastern facade the caps are being placed. With the exception of the roof-girders, the steel work is fairly well along. Work on the underground corridor between Austin Hall and the new building has progressed rapidly and it is now practically finished...

Author: NO WRITER ATTRIBUTED | Title: Work on New Law School Building | 12/11/1906 | See Source »