Search Details

Word: shedding (lookup in dictionary) (lookup stats)
Dates: during 1910-1919
Sort By: most recent first (reverse)


Usage:

Work on the terminal of the Cambridge subway near Harvard square is being pushed in order that it may be completed in time for the opening of the new rapid transit line in December. The steel frames for the machine shop and for the inspection shed, built on solid concrete foundations several feet below the level of the surrounding streets, are already erected. Several tracks are also laid from the mouth of the subway leading to the yard and shops. The terminal yard lies between Boylston and Murray streets. Beside the shops there is a large storage yard...

Author: NO WRITER ATTRIBUTED | Title: Progress of Subway Terminal | 10/3/1911 | See Source »

Although there are but two tracks in the tunnel beyond the Harvard square station they branch out into three at the entrance of the terminal yard where they connect with any one of 20 tracks in the shop, shed and the storage yard. The yard plans show three tracks in the machine shop, five in the inspection shed, nine in the storage yard, of which only six will be installed now, an extra track on the other side, and a loop track around the entire terminal...

Author: NO WRITER ATTRIBUTED | Title: Progress of Subway Terminal | 10/3/1911 | See Source »

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | Next