Word: sites
(lookup in dictionary)
(lookup stats)
Dates: during 1970-1979
Sort By: most recent first
(reverse)
...Science Center will be a building of gigantic proportions. It includes 297,000 gross square feet of space; when finished in September, 1972, production costs total $17.6 million. That figure includes construction costs, site work, architects fees and lab furnishings. Not included are the expenses which are required to open the building for use, such as most lab equipment and maintenance costs. According to Rustam Z. Kothavala, lecturer in Geology and director of the Center until the end of this month, these costs are expected to be an additional $15 million the first year and nearly $1.0 million each year...
...When this group of attackers retired," journalist Mora said, "some people who were watching from the roofs or their houses threw down sticks for the students to defend themselves. Some bricklayers at a nearby construction site gave the students pieces of wood with the same intention...
...building-part of the Treelands site slated for demolition to make room for more graduate student housing-was returned to the Graduate School of Design, where it houses two classes per week. The women, after a triumphant march through Cambridge, stepped up their two-year search for a suitable center...
...Cambridge City Council last night defeated a resolution that would have barred Harvard from building on the Treeland site without the prior agreement of the Riverside Planning Team...
Saundra Graham, representing the Riverside Planning Team, introduced the resolution, which would have instructed the Cambridge City Manager to deny Harvard demolition and building permits for the Treeland site "until such time as Harvard and the Riverside Planning Team agree on a plan that meets the needs of residents for low rent housing...