Search Details

Word: speeding (lookup in dictionary) (lookup stats)
Dates: during 1950-1959
Sort By: most recent first (reverse)


Usage:

Avco is working on two MHD generators. One of them will burn coal in a stream of compressed, preheated air. While passing through the flame, the air gets hotter, expands and rushes out of the furnace at high speed. A small amount of potassium chloride fed into it increases its ionization and makes it a better electrical conductor. Then the stream shoots into a hollow cone made of a heat-resisting, nonconducting material (see diagram). Electrical coils outside the cone create a strong magnetic field. As the gas speeds through, a powerful current of electricity flows across...

Author: /time Magazine | Title: Science: Gas in the Generator | 11/30/1959 | See Source »

...travelling particle receives its energy in a series of electrical "kicks," which increase its speed until it accumulates a total of six billion electron volts...

Author: NO WRITER ATTRIBUTED | Title: Electron Accelerator Begins Fundamental Operations | 11/28/1959 | See Source »

...weather was a big factor. Snow and icy roads in much of the north tended to discourage motoring and to hold down speed...

Author: By The ASSOCIATED Press, | Title: Atlas Missile Fails in Moon Shot, Crash Strengthens Russians' Lead; Weather Drops Holiday Death-Toll | 11/27/1959 | See Source »

Pittenger improved the rest of the press box facilities until the services rendered "were as good as we could make them as far as speed and accuracy." There were changes "designed to make the place a little more homey--but on a rainy day, you're still going to get wet in our press box," Pittenger says. "Now that we've got it homey, we want...

Author: By Michael S. Lottman, | Title: The Man in the Pressbox | 11/27/1959 | See Source »

...Washington this week as guests of the Navy will fly a planeload of businessmen and scientists to inspect a new system being used by the Navy to speed production of new weapons. The system, called Program Evaluation and Review Technique (PERT) was set up to schedule and keep under continuous review the progress of the Polaris missile program, an administrative task rivaling the Manhattan Project in complexity. Thanks largely to PERT, the Polaris missile is programed to be operational in late 1960, two years ahead of schedule...

Author: /time Magazine | Title: MANAGEMENT: The Company Doctors | 11/23/1959 | See Source »

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | Next