Search Details

Word: stairways (lookup in dictionary) (lookup stats)
Dates: during 1900-1909
Sort By: most recent first (reverse)


Usage:

...Elwell and exhibited at the Pan-American Exposition at Buffalo in 1901, has been presented to the Union by S. B. Elwell '10 and A. F. Elwell '10. The figure, which will be received in three or four weeks, will probably be placed on the wall over the stairway leading from the main hall of the Union to the second floor...

Author: NO WRITER ATTRIBUTED | Title: Plaster Cast Presented to Union | 11/2/1906 | See Source »

Emerson Hall will probably be sufficiently completed by December 15 to be opened for public inspection. The top floor, where are the section rooms, dark rooms for laboratory work, and small rooms for separate study, is now practically finished. The glass sky-light, able the main stairway, has already been put in place. All the doors and floorings have been laid, the walls have been painted, and in many of the rooms furnishings, such as laboratory tables and blackboards, have been installed...

Author: NO WRITER ATTRIBUTED | Title: Opening of Emerson Hall Dec. 15 | 11/16/1905 | See Source »

...this spring, in addition to the 25 installed last year. The total 79 are distributed among the various buildings as follows: one in each entry of Hollis; one in each entry of Hollis; one in each entry and one in the porter's room of Stoughton; one on each stairway between the second and third floors of Holworthy; one in each entry and one in the porter's room of Thayer; two in each entry and one in the porter's room of Weld; one in the porter's room of Wadsworth; one in room 37, one in the second...

Author: NO WRITER ATTRIBUTED | Title: Location of Fire Extinguishers | 5/4/1905 | See Source »

...stove, and is connected by telephone with the other wards and the office of the infirmary. The wards have southerly, easterly, and westerly exposures. On the fourth story there are seven bedrooms for nurses. The only direct communication between the four floors is an exterior iron stairway, open...

Author: NO WRITER ATTRIBUTED | Title: The New Contagious Ward | 4/11/1905 | See Source »

Work on the interior of the building is well under way. Skeleton floors and partitions have been built and the main stairway is at present being erected. The ceilings are being furred in preparation for the plastering which will be begun about the middle of April...

Author: NO WRITER ATTRIBUTED | Title: Work on Emerson Hall. | 3/22/1905 | See Source »

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Next