Search Details

Word: stillings (lookup in dictionary) (lookup stats)
Dates: during 1900-1909
Sort By: most recent first (reverse)


Usage:

...Book" was issued containing a sketch of each man and a class history: this book was sold for three dollars and the album was issued at the price of five dollars. This year, however, the Photographic Committee have put both the lives and the class history in the album, still keeping the price five dollars. This addition, to the album has greatly increased its cost of publication and it will be necessary to sell 500 copies to avoid a deficit; but up to the present time only about 180 members of the class have made deposits at Notman's. Inasmuch...

Author: NO WRITER ATTRIBUTED | Title: Improvements in 1904 Album. | 4/11/1904 | See Source »

...Throughout the game the base-running was discouraging, as the men watched the ball instead of running hard. In fielding, the work was good at times, but on the whole uncertain. The most encouraging feature of the game was the throwing which was fairly accurate, although the men are still slow in getting the ball...

Author: NO WRITER ATTRIBUTED | Title: THE WEEK IN BASEBALL | 4/9/1904 | See Source »

...GEOLOGICAL CONFERENCE. Glacial Still ways and Abandoned Waterfalls of the Northern Adirondack. (Illustrated.) (30m.) Professor J. B. Woodworth.--The Principle of Regional Geography (20m.) Professor Davis. Geological Lecture Room...

Author: NO WRITER ATTRIBUTED | Title: University Calendar. | 4/9/1904 | See Source »

...tennis courts on Jarvis Field, although still very soft, were opened for play yesterday afternoon. Today they will be entirely raked over and rolled, and will probably be in condition for play by 11 o'clock. All the back stops have been repaired and are now in good condition: new wire netting has been put up in many places...

Author: NO WRITER ATTRIBUTED | Title: Tennis Courts Open for Play. | 4/6/1904 | See Source »

Progress on the tennis courts has been delayed by the frost and it will be impossible to have them in condition for play before next Wednesday. All the courts on Jarvis Field have been raked and fresh dirt added to make an even surface, but as the ground is still too soft for use, only two or three courts have been rolled. A new wire netting has been put in the centre backstop and the other two backstops are to be repaired. Work on the Holmes Field courts will be begun in about a week...

Author: NO WRITER ATTRIBUTED | Title: Work on the Tennis Courts. | 4/1/1904 | See Source »

Previous | 129 | 130 | 131 | 132 | 133 | 134 | 135 | 136 | 137 | 138 | 139 | 140 | 141 | 142 | 143 | 144 | 145 | 146 | 147 | 148 | 149 | Next