Word: stuccoed
(lookup in dictionary)
(lookup stats)
Dates: during 1890-1899
Sort By: most recent first
(reverse)
...Newell gate has been completed and will soon be formally opened. The lodge is built of Boston brick and stucco, and is two stories high. On the first floor there is a reception room for ladies, and a room for the use of coaches and managers, and on the second floor are the rooms for the use of the ground-keeper. The fence, which is nine feet in height, is of open iron-work and heavy pillars built of a stone composition, with brick trimmings. There are also new gates opposite the Carey building, and at the extreme...
...Fogg Art Museum is rapidly nearing completion. The mosaic floor has already been laid, the stucco work is finished, and the wood work is nearly completed, so that comparatively little remains to be done. The building will probably be entirely finished in about a month...
...work on the mosaic floor in the Fogg Art Museum is almost finished. The stucco work in the front rooms on the first floor, and in all the rooms on the second floor is completed. It will be some time, however, before the large lecture room will be finished...
...interior work on the Fogg Art Museum is slowly progressing. At present twelve men are busy laying the mosaic floor in the main hall. This work will be finished in a week. Twenty-five men are doing the stucco work in the front room on the first floor and in the large lecture room. They will finish the work in about a month and will be followed by the carpenters. The wood-work will require several months, so that the building will not be finished before June...