Search Details

Word: swanton (lookup in dictionary) (lookup stats)
Dates: during 1990-1999
Sort By: most recent first (reverse)


Usage:

...buildings served by the cable arenormally supplied by two redundant sources ofpower, there should be no noticeable difference inservice as repair work continues, Swanton said.The only effect should be the momentary loss ofservice noticed by Eliot House residents at thetime of the explosion, he added...

Author: By Steve S. Chien, | Title: Volt Line Causes Explosion | 10/16/1993 | See Source »

Harvard Facilities Maintenance crews responded immediately after their detectors in Holyoke Center reported the line fault. Bruce D. Swanton, an electrical engineer with Facilities Maintenance, said repair work should be finished over the weekend, as workers identify and replace the failed equipment...

Author: By Steve S. Chien, | Title: Volt Line Causes Explosion | 10/16/1993 | See Source »

...under the maintenance hole cover heatedsuddenly by the energy released from the failedcable was the direct cause of the explosion,Swanton said. What caused the wire to failinitially is still unknown...

Author: By Steve S. Chien, | Title: Volt Line Causes Explosion | 10/16/1993 | See Source »

| 1 | 2 | 3 | 4 | 5 | 6 | Next