Search Details

Word: thermographs (lookup in dictionary) (lookup stats)
Dates: during 1956-1956
Sort By: most recent first (reverse)


Usage:

Michael R. Milano and Gerald M. Amero wrote in behalf of the residents of Weld South that the low temperature in their rooms between 9 p.m. and 9 a.m. was "conducive to colds." The next day, two engineers placed a thermograph in the yardlings' room, which measured the heat in the room, and three days later a new thermostat was giving more heat to Weld...

Author: NO WRITER ATTRIBUTED | Title: Plea to Pusey Increases Heat in Weld Hall South | 12/15/1956 | See Source »

...letter was given to Arthur D. Trottenberg, manager of operating services, who directed two engineers to investigate the freshman complaint. After installing the thermograph, they checked the instrument daily and found that the temperature in the room went down as low as 59 degrees...

Author: NO WRITER ATTRIBUTED | Title: Plea to Pusey Increases Heat in Weld Hall South | 12/15/1956 | See Source »

...engineers decided to install a new thermostat, the effectiveness of which they later checked with a new thermograph, which showed the new average temperature of the room to be about 70 degrees. Milano and Amero have since reported that the room has been too hot at times since the new thermostat was installed...

Author: NO WRITER ATTRIBUTED | Title: Plea to Pusey Increases Heat in Weld Hall South | 12/15/1956 | See Source »

| 1 | 2 | Next