Search Details

Word: tiled (lookup in dictionary) (lookup stats)
Dates: all
Sort By: most recent first (reverse)


Usage:

...building is three stories in height, with a loft for storage purposes. The structure is absolutely fireproof, and represents the latest ideas in current construction. The floors, roof and stairways are built of reinforced concrete, while the outer walls are of brick and the inner walls of hollow tile blocks. The roof is slated, and has, on the top, a flat runway, on each end of which a steel lattice-work tower for supporting wireless antenna is to be erected. These have not yet been erected, but will be in place in a few weeks. The building contains 25 rooms...

Author: NO WRITER ATTRIBUTED | Title: CRUFT LABORATORY COMPLETE | 1/4/1915 | See Source »

...ground was broken for the new Widener Memorial Library, and the corner stone was laid with impressive ceremonies on June 16, 1913. The exterior work on the building is now completed, and the plastering which is at present occupying the workmen, will probably not be finished until August. The tile work, floors, painting, and decorating still remain to be done...

Author: NO WRITER ATTRIBUTED | Title: FOUR MILLION AND A HALF | 6/16/1914 | See Source »

...Sizer and his proof readers care to take this seriously, let it be known that the game can be arranged for any day after the mid-year period. Further- more one might add by way of warning that although we may not dwell in halls of imported tile, we are the boys who put the ink in rink; aside from this we have destructive qualities and although we hate to make "light" of a serious subject we feel that we could take the lamp out of Lampoon. Be all this as it may, our forwards are alert and our wings...

Author: NO WRITER ATTRIBUTED | Title: READY FOR HOCKEY REGATTA | 1/30/1914 | See Source »

...building is situated in back of Lawrence Hall, between if and the Jefferson Physical Laboratory. Harvard brick and marble are the construction materials, and tile is to be used for the floors of the foyer. There are to be two entrances and porches, one on the west and the other on the north side of the building; the west porch will be of semi-circular construction, while that to the north is rectangular and upheld by pillars. On the first floor there will be, besides the vestibule, coat room and secretary's room, a large foyer from which a broad...

Author: NO WRITER ATTRIBUTED | Title: MUSIC BUILDING READY IN APRIL | 10/31/1913 | See Source »

...whole the team is well fitted to enter upon this series. The showing made on the Southern trip has been more than maintained, and the evident need for better fielding has been in a large measure remedied, while tile good stick work has been improved, if anything, by an ability to place the hits where they would do the most good. The defeat at the hands of Colby came on the only day when there was a slump in both the fielding and batting departments. Up to that time when the fielding was poor the work at bat more than...

Author: NO WRITER ATTRIBUTED | Title: SUPPORT THE BASEBALL TEAM. | 5/3/1913 | See Source »

Previous | 112 | 113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 | 121 | 122 | 123 | 124 | 125 | 126 | 127 | 128 | 129 | Next