Word: wolcott
(lookup in dictionary)
(lookup stats)
Dates: during 1910-1919
Sort By: most recent first
(reverse)
...Keelan (E). Section 7: A. K. Hobby (A), R. W. Blanchard and S. Z. Charak (B), W. H. Distler (C), M. S. Kjorlaug and E. T. Leddy (D), J. W. Eckelberry (E). Section 8: J. B. Moore (A), C. Morris and C. V. Johnstone (B), J. G. Wolcott (C), J. R. Morton and A. M. Rodgers (D), R. R. Smith (E). Section 9: J. L. Rosenberg (A), R. B. Ladoo and S. K. Gibson (B), G. E. Fahys (C), L. G. Woodruff and A. P. McMahon (D), H. R. Sanford (E). Section 10: W. M. Applebaum (A), C. C. Wheaton...
...Klein (B); B. J. Frenckel (C); I. Levine (D). Section 21: L. B. Kagan (A); A. B. Haw (B); C. E. Kennedy (C); B. Z. Nelson (D). Section 22: D. W. Lewis (A); E. T. Cohen (B); E. B. Friedberg (C); G. F. Stowell (D). Section 23: J. G. Wolcott (A); E. F. Cahill (B); W. A. O'Shea (C); H. Gluckoff (D). Section 24: H. H. Breeland (A); B. C. Van Tine (B); J. Downing (C); A. Fleisher (D). Section 25: W. W. Clarke (A); J. L. Kimberly (B); H. Rogers (C); J. E. Rogers (D). Section...
...Wolcott Gibbs Memorial Laboratory, one of the proposed six new chemical buildings, is also nearing completion. This laboratory is being constructed on Frisbie place, and was commenced last fall. The interior walls have already been plastered and what remains to be done will be finished within two months...
Foundations have been laid for the Coolidge Memorial Laboratory, another of the proposed chemical buildings, which will be situated directly to the east of the Wolcott Gibbs Laboratory. Work on the Coolidge building began six weeks ago, but was delayed because the plans for a heating system had not been completed. As yet, plans for the upper structure of the building are not definite, and no date for the completion of the building can be given...
...work on the Wolcott Gibbs Memorial Laboratory, the first of the six proposed new chemical laboratories, is progressing rapidly. The superstructure is complete as far as the second story and the forms for the concrete floor are already in place. The white tilling in the corridor and laboratories of the first floor will be put in place this month. At the present rate of construction the building will be ready for occupancy on September...